List of Major Environmental Projects
Aquaculture
A weekly consultancy to 8 tropical fish-farms in the Shalom region. Training, construction and initial operation.
1995 - 1996
A weekly consultancy to a tropical fish-farm at Kibbutz Tirat-Zvi.
Training, construction and initial operation.
1996 - 1997
A member of a steering board – a feasibility study for a novel mariculture project.
At the Ashkelon-Coast regional council.
1998
A visiting scientist – a field survey and preliminary project : Small-scale aquaculture system. Carried out for “BAIF Development Research Foundation (India)” (2001)
2001
A member of a planning group of an offshore mariculture area, headed by "AdaMa – Environmental & Geological Sciences".
2011 - 2013
Ecology (Terrestrial)
Field Flora & Fauna surveys of planned industrial parks, Posphate mines, quarry sites and residential areas. Sections of Environmental Impact Statements. Carried out for “Eldad Sharoni – Environmental Engineering Ltd.” (1997, 2004), “A.B. Environmental Engineering Services Ltd” (3 projects, 1998-2001), “Geoprospect Jerusalem Ltd.” (16 projects, 2000-2012) and “Top – Consulting and Engineering Ltd.” (8 projects, 2007-2013).
1997 - 2013
Environmental consultant in planning boards of Regional Master Plans for Modiin Regional Council and Kiriat-Mal’achi.
1998 - 1999
Field Flora & Fauna surveys of planned power stations. Sections of Environmental Impact Statements. Carried out for "Y. Goldsmid, Environmental Engineering".
2001 - 2005
Wildlife survey and an environmental statement for the Ashalim solar power station and conduction line (2010) and Arad-Masada line (2013). Carried out for Israel Electrical Company.
2010 - 2013
Ecological consultant for the National Infrastructures Committee.
2010
Ecological consultancy and supervision of Railroad construction works. Carried out for "Yenon – Research & Design LTD." (4 projects, 2011-2013) and Road construction works, for "KSM, West End Group Architects and Environmental Planners" (2 projects, 2011-2012).
2011 - 2013
Ecological consultant for the Natural Gas Delivery System Hadera-Netanya and Beit-keshet – Kiriat-shmone. Carried out for "AVIV AMCG".
2012 - 2013
Wildlife surveys and Ecological consultancy for exploratory drillings at the Golan heights. Carried out for “Geoprospect Jerusalem Ltd.” .
2013 - 2014
Ecological consultant for a lake and ecological pond project. Carried out for the Afula municipality.
2013
Ecological consultant for landscape restoration at the Sorek desalination plant. Carried out for "ITB Eng. Ltd.".
2014
Ecological consultant for Naharia North promenade. Carried out for Israel Government Tourist Corporation and "Epstein project management".
2014 - 2015
Ecological consultant for planning of Metropolitan Recreation Area, Beer-Sheva. Carried out for Israel Government Planning Administration.
2016
Ecological consultant for Kiriat-Ata by-pass road. Carried out for "AVIV AMCG".
2016 - 2017
Ecological consultant for Natural Gas Delivery System Afula-Jenin. Carried out for “Geoprospect Jerusalem Ltd.”.
2017
Ecological survey at “Sha’ar Shomron” industrial area, Carried out for “Minad, Landscape planning”.
2018
Urban Nature Survey at “Emek Boyar – Nachal Hayovel”. Carried out for Jerusalem municipality.
2018
Ecological surveys at Almon and Gitit solar energy projects. Carried out for “Geoprospect Jerusalem Ltd.”.
2018 - 2019
Ecological surveys and consulting for road planning (4 projects). "AdaMa – Environmental & Geological Sciences" and "Netivei Israel – National Transport Infrastructure Company Ltd".
2019 - 2021
Ecological consultant for a residential area at Gisr a Zarka west. Carried out for Gisr a Zarka municipality.
2019
Ecological consultancy for operation center of the metro line M2. Carried out for “Geoprospect Jerusalem Ltd.”
2020
Marine and Coastal Ecology
The possible impact of the Haifa Marina Project on the marine reserve of Shiqmona. Carried out for the “Haifa Economic Corporation Ltd.”.
1997
Akko bay, Marine outfall of industrial wastewater – A biotic base-line study. Carried out for the “Electrochemical Industries (1952) Ltd.”.
1998
Environmental coordinator for preliminary planning of marine desalination installations. Carried out for “Top – Consulting and Engineering Ltd.”.
1998
The environmental impact of marine discharge of the “shifdan” sludge. Carried out for “The Israeli Union for Environmental Defense.”.
1999
Akko bay, Marine outfall of saline wastewater – A biotic base-line study. Carried out for “Sinapsa Ltd.”.
2000
Dor - Nachal Dalia coast - A biotic base-line study and sections of an Environmental Impact Statement. Carried out for "Adama, Environmental & Geological Sciences".
2002
The possible impact of the Etzel overwater interchange (Haifa), on the marine ecosystem.) Carried out for "Yefe-Nof Ltd.".
2003
Biotic surveys of benthos near "Orot-Rabin", Ashdod & "Rutenberg" power- stations. Carried out for Israel Electric Company.
2004 - 2007
Akko - south project - A biotic base-line study and sections of an Environmental Impact Statement. Carried out for "Aviv – Enosh, Environmental systems".
2005
Environmental consultant for the National Infrastructures Committee.
2010 - 2015
Ashdod port - A biotic marine survey and sections of an Environmental Impact Statement. Carried out for " DHV MED". (2010) and "AdaMa" – Environmental & Geological Sciences". (2012)
2010 - 2012
Carmel Beach – A biotic marine survey and sections of an Environmental Impact Statement. Carried out for " Top – Consulting and Engineering Ltd.".
2011
Ecological marine consultant of a feasibility study for Diversion of the Ayalon river. Carried out for "Yahel Engineers Ltd.".
2011
A member of a planning group of an offshore mariculture area, headed by "AdaMa – Environmental & Geological Sciences".
2011
SAMUEL, GABRIELLA, SHEMEN & YITZHAK offshore wells - Ecological marine consultant for Environmental Impact Assessments, Carried out for "AdaMa – Environmental & Geological Sciences".
2012
Wildlife inventory survey at the Rishon LeTzion beach. Carried out for AVIV AMCG
2013
Expansion of the Namibe Port (Angola) - Ecological survey and Environmental Impact Assessment. Carried out for "Logistica, Angola LDA" .
2013
Monitoring of ecological impact (in-fauna) of fish farm in Ashdod port. Carried out "EcoStream Ltd." (2013-2015, 2018-2019)
2013 - 2019
Ecological consultant for promenade – Acre and Naharia North. Carried out for Israel Government Tourist Corporation and "Epstein project management".
2013 - 2015
A member of a planning group of Strategic Environmental Survey for offshore Oil and Gas exploration and production. Carried out for “Geoprospect Jerusalem Ltd.” and the Ministry of National Infrastructures, Energy and Water resources.
2015 - 2016
Marine ecologist and principle scientist of monitoring of the hard bottom at the Hamifratz Port Extension Project. Carried out for "Marine Ventures Intl." and "Shapir-Ashtrom".
2015 - 2018
Marine ecologist and principal investigator of the Environmental Monitoring Program (EMP) of the Hamifratz Port Extension Project. Carried out for "Marteam" and "Shapir-Ashtrom".
2016 - 2019
“Oz” offshore well. Ecological marine consultant for Environmental Impact Assessments, Carried out for "Ludan, Environmental Technologies”.
2016 - 2017
Marine ecologist of the Defence of the Coastal Cliff – Analysis of cells. Carried out for “Pro-S.I.E.”
2016 - 2018
2017
Ecological survey of Sde-Dov district Plan. Carried out for "AdaMa – Environmental & Geological Sciences".
Ecological consultant for Strategic Plan for Kiriat-Yam. Carried out for “Yozmot for the Environment:.
2017
Ecological consultant for Marine terminal for Ammonia. Carried out for “Geoprospect Jerusalem Ltd.”
2017 - 2018
Ecological consultant for Terminal for chemicals at Haifa port. Carried out for “Israel Port Company”.
2019
Ecological consultant for the kinnet Canal in Eilat. Carried out for "AdaMa – Environmental & Geological Sciences".
2020
Water Treatment and Soil Remediation
The “Gat” Wastewater Treatment Plant – An Environmental Impact Assessment. Carried out for “Enosh - Environmental Systems Ltd.”
1997
A visiting scientist – a field survey and preliminary proposal : Collection, treatment and reuse of wastewater, using a series of waste stabilization ponds. Carried out for “BAIF Development Research Foundation (India)”
2001
Israeli Risk-Based Corrective Action (iRBCA). Member of the Workgroup
2007 - 2010
Ecological consultant of Electro BioRemediation, EBR system. For "Elgressy Engineering Services LTD."
2009 - 2010